Earthworks, foundations, piling and the structural works that carry the plant — through to final finishes.
Three DTH and three auger rigs. Owning the fleet gives HELIOX direct control of a critical-path activity, rather than relying entirely on hire availability.
Foundation integrity is verified by our own pile-testing team before structures are loaded.
Telehandler, wheel loader, motor grader and excavator available through owned and contracted capacity, confirmed per project on mobilisation.




Send your tender documents, prequalification questionnaire or scope enquiry. We acknowledge within 2 working days and respond in your own format.